TM 9-2320-366-34-3
16-38. M1089 ERECTION CYLINDER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Position boom on boom rest (TM 9-2320-366-10-
2).
Hydraulic reservoir supply valve and return valve
closed (TM 9-2320-366-10-2)
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench Set, Socket (Item 84, Appendix B)
Pan, Drain (Item 43, Appendix B)
Tools and Special Tools (Cont)
Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B)
Materials/Parts
Cap and Plug Set (Item 17, Appendix C)
Sealing Compound (Item 76, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape (Item
30, Appendix C)
Personnel Required
(2)
a. Removal.
(1) Remove two screws (1), washers (2), and bushings (3)
from rivet eyebolts (4).
(2) Remove two rivet eyebolts (4) from pivot shaft (5).
WARNING
Remove pivot shaft enough to release
tension link cylinder and erection cylinder.
Failure to comply may result in injury to
personnel or damage to equipment.
NOTE
Step (3) requires the aid of an assistant.
(3) Remove pivot shaft (5) from tension link cylinder (6).
16-216