TM 9-2320-366-34-3
(22) Install preformed packing (29) on fitting (30).
(23) Connect hose (31) to fitting (30).
NOTE
Perform steps (24) and (25) on RH lift
cylinder.
(24) Install three tubing clamps (32) on hose (31) with three
screws (33).
(25) Connect overload lockout connector (34) to overload
shutdown assembly (35).
c. Follow-On Maintenance.
(1) Position hydraulic reservoir supply valve and return
valve in open position (TM 9-2320-366-10-2).
(2) Connect batteries (TM 9-2320-366-20-3).
(3) Lubricate lift cylinder (TM 9-2320-266-20).
(4) Perform crane load test (para 16-62).
End of Task.
16-215