TM 9-2320-366-34-3
(8) Remove two screws (3) and swing drive assembly
bracket from swing drive assembly (2).
(9) Install plate (4) on swing drive assembly (2) with two
screws (3).
f. Follow-On Maintenance.
(1) Install hydraulic orbit motor (Para 16-25).
(2) Install cross relief valve (Para 16-24).
(3) Hydraulic reservoir supply valve and return valve in
open position (TM 9-2320-366-10-1).
(4) Perform crane load test (para 16-31).
End of Task.
16-123