TM 9-2320-366-34-3
16-16. M1084/M1086 TENSION LOAD CELL REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Boom positioned over cargo bed (TM 9-2320-366-
10-1).
Batteries disconnected (TM 9-2320-366-20-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Bar, Wrecking (Item 6, Appendix B)
Sling, Cargo (Item 56, Appendix B)
Materials/Parts
Cap and Plug Set (Item 17, Appendix C)
Packing, Preformed (2) (Item 217, Appendix F)
Packing, Preformed (Item 261, Appendix F)
Lockwasher (Item 138, Appendix F)
Sealing Compound (Item 76, Appendix C)
Ties, Cable Plastic (Item 92, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape
(Item 30, Appendix C)
Personnel Required
(2)
a. Removal.
NOTE
· Tag
electrical
connectors
and
connection
points prior to disconnecting.
· Remove plastic cable ties as required.
(1) Disconnect tension load cell connector (1) from overload
shutdown box (2).
(2) Disconnect proximity sensor connector (3) from overload
shutdown box (2).
16-80