TM 9-2320-366-34-3
16-4. M1084/M1086 BOOM FLY SECTION REPLACEMENT/ADJUSTMENT
This task covers:
a. Removal
b. Cleaning/Inspection
c. Installation
d. Adjustment
e. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Boom positioned level over cargo bed with boom mid
section fully extended and boom fly section partially
extended (TM 9-2320-366-10-1).
Batteries disconnected (TM 9-2320-366-20-3).
Hook block assembly removed (TM 9-2320-366-20-5).
Boom sheave removed (TM 9-2320-366-20-5).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Sling, Cargo (Item 56, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B)
Tools and Special Tools (Cont)
Caliper Set, Micrometer, Outside (Item 9,
Appendix B)
Materials/Parts
Rag, Wiping (Item 60, Appendix C)
Solvent, Dry Cleaning (Item 83, Appendix C)
Grease, Ord, Extreme Pressure (Item 38,
Appendix C)
Pin, Cotter (4) (Item 324, Appendix F)
Sealing Compound (Item 76, Appendix C)
Rope, Fibrous (Item 62, Appendix C)
Personnel Required
(2)
a. Removal.
CAUTION
Overload shutdown cable is on a tension reel.
Allow cable to rewind slowly. Failure to comply
may result in damage to equipment.
(1) Remove overload shutdown cable eye (1) from screw
(2).
16-19