TM 9-2320-366-34-2
d. Follow-On Maintenance.
(1) Install rear wheels (side being worked) (TM 9-2320-366-
10-2).
(2) Test operate vehicle (TM 9-2320-366-10-1).
(3) Check rear bogie axle for oil leaks.
(4) After first 1000 miles of vehicle operation, tighten self-
locking nuts on U-bolts in increments of 50 lb-ft (68 N·m)
to 390-510 lb-ft (529-692 N·m) in sequence.
End of Task.
Change 1
10-27