TM 9-2320-366-34-3
(9) Position four screws (11), eight washers (12), and four
nuts (13) on 30K winch assembly (2).
(10) Tighten four nuts (13) to 76-84 lb-ft (103-114 N·m).
(11) Position valve manifold assembly (14) on 30K winch
assembly (2) with two washers (15), screws (16), and
nuts (17).
(12) Tighten two nuts (17) to 12-24 lb-in. (1-3 N·m).
(13) Connect air hose (18) to valve manifold assembly (14).
(14) Position terminal board (19) on 30K winch assembly (2)
with two washers (20), screws (21), and nuts (22).
(15) Tighten two nuts (22) to 12-24 lb-in. (1-3 N·m).
NOTE
Install plastic cable ties as required.
(16) Route remote control harness (23) through 30K winch
assembly (2).
(17) Position cable harness (24) by terminal board (19).
NOTE
Terminal board uses friction type connections.
Screws are not removed.
(18) Install 10 wires (25) to top of terminal board (19).
16-371