TM 9-2320-366-34-3
(5) Install manual override valve (7) on crane control panel
(8) with four washers (9), two lockwashers (10), bolts
(11), and nuts (12).
(6) Connect hose (13) to 90-degree fitting (6).
(7) Connect tube (14) to fitting (3).
(8) Connect connector (15) to manual override valve (7).
c. Follow-On Maintenance.
(1) Connect batteries (TM 9-2320-366-20-3).
(2) Operate MHC and check for hydraulic leaks and for
proper operation (TM 9-2320-366-10-1).
End of Task.
16-169