TM 9-2320-366-34-3
16-32. M1089 MATERIAL HANDLING CRANE (MHC) REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
30K winch cables removed (TM 9-2320-366 20-5).
Hydraulic reservoir supply valve and return valve
closed (TM 9-2320-366-10-2).
Batteries disconnected (TM 9-2320-366-20-3).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B)
Wrench Set, Crowfoot, Ratcheting (TM 9-2320-
366-20)
Multiplier, Torque Wrench (Item 42, Appendix B)
Adapter, Socket Wrench (Item 3, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Tools and Special Tools (Cont)
Pan, Drain (Item 43, Appendix B)
Sling, Cargo (2) (Item 56, Appendix B)
Trestle, Motor Vehicle Maintenance (4) (Item 81,
Appendix B)
Materials/Parts
Cap and Plug Set (Item 17, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape (Item
30, Appendix C)
Sealing Compound (Item 76, Appendix C)
Ties, Cable Plastic (Item 92, Appendix C)
Personnel Required
(3)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris. Failure to
comply may result in injury to personnel.
a. Removal.
NOTE
· Tag electrical connectors and connection
points prior to disconnecting.
· Remove plastic cable ties as required.
(1) Disconnect 13 electrical connectors (1) from eight bank
control panel (2).
(2) Disconnect connector (3) from main control panel (4).
16-174
