TM 9-2320-366-34-3
16-6. M1084/M1086 BOOM BASE SECTION REPLACEMENT (CONT)
c. Follow-On Maintenance.
(1) Install boom tubes (TM 9-2320-366-20-5).
(2) Install boom hoses (TM 9-2320-366-20-5).
(3) Install tension load cell (para 16-16).
(4) Install hoist assembly (para 16-13).
(5) Install proximity switch (para 16-15).
(6) Install overload shutdown (para 16-22).
(7) Install boom mid section and telescopic cylinder (para
16-5).
(8) Check fluid level in hydraulic reservoir; refill as required
(TM 9-2320-366-20).
(9) Perform crane load test (para 16-31).
End of Task.
16-42