TM 9-2320-366-34-3CAUTIONWhen removing bolts, continuous removal ofcollars is mandatory. Failure to comply willresult in seizing of collars to bolts.NOTE• Left and right side of cargo bed is removed thesame way. Left side shown.• Step (2) requires the aid of an assistant.(2) Remove 10 collars (3) and bolts (4) from cargo bed (2).Discard collars and bolts.(3) Perform step (2) on right side of cargo bed.WARNINGCargo bed weighs approximately 2660 lbs(1208 kgs). Attach a suitable lifting deviceto four corner tiedown points prior toremoval. Failure to comply may result ininjury to personnel or damage toequipment.NOTEStep (4) require the aid of three assistants.(4) Remove cargo bed (2) from vehicle.b. M1083/M1084 Installation.WARNINGCargo bed weighs approximately 2660 lbs(1208 kgs). Attach a suitable lifting device tofour corner tiedown points prior toinstallation. Failure to comply may result ininjury to personnel or damage to equipment.NOTEStep (1) requires the aid of three assistants.(1) Position cargo bed (1) on vehicle.Change 1 15-127
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business