TM 9-2320-366-34-2
14-4. REAR LEAF SPRING REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Both rear wheels removed (from side being replaced)
(TM 9-2320-366-10-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B)
Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Wrench Set, Socket (Item 84, Appendix B)
Tools and Special Tools (Cont)
Jack, Dolly Type, Hydraulic (2) (Item 37,
Appendix B)
Trestles, Motor Vehicle Maintenance (4) (Item
81, Appendix B)
Materials/Parts
Nut, Self-Locking (4) (Item 198, Appendix F)
Nut, Self-Locking (8) (Item 226, Appendix F)
U-bolt (2) (Item 20.1, Appendix F) (All models
except M1086, M1088, M1089)
U-bolt (2) (Item 20.2, Appendix F (M1086,
M1088, M1089)
Personnel Required
(2)
WARNING
Wear appropriate eye protection when
working under vehicle due the possibility
of falling debris. Failure to comply may
result in injury to personnel.
a. Removal.
(1) Place two trestles under frame (1).
(2) Place trestle under intermediate axle (2) and rear axle
(3).
14-16
Change 1