TM 9-2320-366-34-3
16-68. M1089 UNDERLIFT AND STIFFLEG ASSEMBLY REPLACEMENT (CONT)
(22) Position six hoses (37) to lower tubing bank (38).
(23) Tighten hoses (37) to 36-39 lb-ft (49-53 N·m).
(24) Position four hoses (39) to upper tubing bank (40).
(25) Tighten hoses (39) to 36-39 lb-ft (49-53 N·m).
NOTE
Step (26) requires the aid of an assistant.
(26) Position center deck plate (41) support structure (42)
with eight washers (43), bolts (44), washers (45), and
self-locking nuts (46).
(27) Tighten self-locking nuts (46) to 105-115 lb-ft (142-156
N·m).
16-416