TM 9-2320-366-34-4
21-2. TRANSMISSION REPAIR
This task covers:
a. Disassembly
b. Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Transmission mounted on maintenance stand (para
7-5).
Transfer case module removed (para 22-2).
Scavenge pump assembly removed (para 7-16).
Control valve module removed (para 7-10).
Torque converter removed (para 7-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Pliers, Retaining Ring (Item 44, Appendix B)
Suitable container [33 qt (31 L) capacity]
Caliper, Vernier (Item 11, Appendix B)
Straight Edge (Item 71, Appendix B)
Caliper Set, Micrometer, Outside (Item 9, Appendix
B)
Indicator, Dial (Item 36, Appendix B)
Tools and Special Tools (Cont)
Caliper, Micrometer, Inside (Item 10, Appendix
B)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix
B)
Gage, Profile (TM 9-2320-366-20)
Materials/Parts
Gasket (Item 60, Appendix F)
Gasket (Item 65, Appendix F)
Gasket (Item 66, Appendix F)
Lubricating Oil, Engine (Item 45, Appendix C)
Cloth, Abrasive (Item 22, Appendix C)
Personnel Required
(2)
a. Disassembly
NOTE
Perform step (1) if transmission is equipped
with PTO cover.
(1) Remove 10 bolts (1), PTO cover (2) and gasket (3) from
torque converter housing (4). Discard gasket.
21-2