TM 9-2320-366-34-3
16-33. M1089 BOOM ASSEMBLY REPLACEMENT (CONT)
(19) Connect hose (23) to boom assembly (1).
(20) Connect four hoses (24) to boom assembly (1).
NOTE
Install plastic cable ties and cable clamps as
required.
(21) Connect overload lockout connector (25) to overload
shut down box (26).
c. Follow-On Maintenance.
(1) Position hydraulic supply and return valves to open
(TM 9-2320-366-10-2).
(2) Install hoist cable (TM 9-2320-366-20-5).
(3) Lubricate MHC (TM 9-2320-366-20).
(4) Connect batteries (TM 9-2320-366-20-3).
(5) Perform crane load test (para 16-62).
End of Task.
16-188