TM 9-2320-366-34-3
16-8. M1084/M1086 ERECTION CYLINDER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
MHC erected with end of boom lowered in cargo
bed (TM 9-2320-366-10-1).
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench, Torque, 0-600 lb-ft (Item 97, Appendix
B)
Wrench Set, Socket (Item 84, Appendix B)
Sling, Cargo (Item 56, Appendix B)
Materials/Parts
Cap and Plug Set (Item 17, Appendix C)
Sealing Compound (Item 76, Appendix C)
Grease, Automotive and Artillery (Item 35, Appendix
C)
Packing, Preformed (2) (Item 235, Appendix F)
Packing, Preformed (2) (Item 261, Appendix F)
Dispenser, Pressure Sensitive Adhesive Tape (Item
30, Appendix C)
Personnel Required
(2)
a. Removal.
CAUTION
Cap or plug hydraulic openings to prevent
contamination of hydraulic system. Failure to
comply may result in damage to equipment.
NOTE
Tag hydraulic hoses and connection points
prior to disconnecting.
(1) Disconnect two hydraulic hoses (1) from 90-degree
fittings (2 and 3).
16-48