TM 9-2320-366-34-3
17-4. M1090/M1094 DUMP BODY HOIST CYLINDER REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Batteries disconnected (TM 9-2320-366-20-3).
Dump body removed (para 15-10).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Pliers, Retaining Ring (Item 45, Appendix B)
Pan, Drain (Item 43, Appendix B)
Bar, Wrecking (Item 6, Appendix B)
Sling, Cargo (4) (Item 56, Appendix B)
Tools and Special Tools (Cont)
Lifting Brackets, Dump Body (Item 8, Appendix D)
Materials/Parts
Shackles (4) (Item 80, Appendix C)
Lubricating Oil, Engine (Item 45, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape (Item
30, Appendix C)
Personnel Required
(2)
a. Removal.
CAUTION
Cap or plug hydraulic hoses and connection
points to prevent contamination of hydraulic
system. Failure to comply may result in
damage to equipment.
NOTE
Tag hydraulic hoses and connection points prior
to disconnecting.
(1) Place drain pan under hoses (1 and 2).
(2) Disconnect hydraulic hoses (1 and 2) from control valve
(3).
17-26
