TM 9-2320-366-34-3
16-62. M1089 CRANE LOAD TEST
This task covers:
a. Static Overload Test
b. Static Overload Proof Test
c. Dynamic Test
d. Follow-on Maintenance
INITIAL SETUP
Equipment Conditions
Vehicle packed on hard level surface (TM 9-2320-366-10-1).
Exercise all MHC functions to their full extent with REMOTE
CONTROL UNIT (TM 9-2320-366-10-1).
Position MHC to rear center line of vehicle (TM 9-2320-366-
10-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Gloves, Welders (Item 27, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Materials/Parts
10000 lb weight
12100 lb weight
13750 lb weight
Personnel Required
(3)
References
TB43-0142
WARNING
When loads are applied to boom cable all personnel must move to a safe distance. Failure to
comply may result in injury to personnel.
Wear appropriate eye protection when working under vehicle due to the possibility of falling
debris. Failure to comply may result in injury to personnel.
Wire rope can become frayed or contain broken wires, wear heavy leather palmed work gloves
when handling wire rope. Failure to comply may result in injury to personnel.
NOTE
Load testing shall be performed from crane local control panel.
16-342
