TM 9-2320-366-34-316-44. M1089 CABLE FOLLOWER REPLACEMENT/REPAIRThis task covers:a. Removalb. Disassemblyc. Assemblyd. Installatione. Follow-On MaintenanceINITIAL SETUPEquipment ConditionsHoist assembly removed (para 16-43).Tools and Special ToolsTool Kit, Genl Mech (Item 78, Appendix B)Tools and Special Tools (Cont)Goggles, Industrial (Item 28, Appendix B)Materials/PartsSealing Compound (Item 76, Appendix C)a. Removal.WARNINGUse care when removing springs. Springsare under tension and can act asprojectiles when released. Failure tocomply may result in injury to personnel.Remove two screws (1), four washers (2), and cablefollower assembly (3) from hoist assembly (4).b. Disassembly.(1) Remove two springs (1) from posts (2).16-239
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business