TM 9-2320-366-34-3
d. Assembly
NOTE
Lubricate all parts with lubricating oil during
assembly.
(1) Install preformed packing (1) on plug (2).
(2) Install plug (2) on valve manifold (3).
(3) Install four preformed packings (4) and two backup rings
(5) on shuttle valves (6).
(4) Install two shuttle valves (6) in top of four way valve
manifold (3).
(5) Install two preformed packings (7) on plugs (8).
(6) Install two plugs (8) in valve manifold (3).
(7) Install two preformed packings (9 and 10) and four
retainers (11) on two solenoids (12).
(8) Install two solenoids (12) in valve manifold (3).
(9) Install two coils (13) on solenoids (12) with nuts (14).
(10) Install preformed packing (15) on relief valve (16).
(11) Install relief valve (16) in valve manifold (3).
16-155