TM 9-2320-366-34-3
NOTE
If gap (A) is larger than .005 in. (0.013 cm),
install shim(s) as required.
(3) Measure gap at location (A) between mounting bracket
(4) and crane pad (5).
(4) Position two bolts (6), shim(s) (7), four washers (8), two
plates (9), and nuts (10) on MHC (3).
(5) Position two bolts (11), four washers (12), two plates
(13), and nuts (14) on MHC (3).
(6) Tighten two nuts (14) to 665-735 lb-ft (900-990 N·m).
16-7