TM 9-2320-366-34-2
7-8. ROTATING CLUTCH SOLENOID ASSEMBLY REPLACEMENT/REPAIR
This task covers:
a. Removal
b. Disassembly
c. Cleaning/Inspection
d. Assembly
e. Installation
f. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Transmission internal wiring harness removed (para 7-
13).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench, Torque, 0-150 lb-in. (Item 91, Appendix B)
Multimeter, Digital (Item 41, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Gloves, Rubber (Item 25, Appendix B)
Wrench Set, Socket (Item 85, Appendix B)
Materials/Parts
Rag, Wiping (Item 60, Appendix C)
Seal, Non-Metallic (Item 375, Appendix F)
Filter Element (3) (Item 32, Appendix F)
Packing, Preformed (Item 297, Appendix F)
Packing, Preformed (2) (Item 298, Appendix F)
Packing, Preformed (2) (Item 300, Appendix F)
Packing, Preformed (Item 293, Appendix F)
Packing, Preformed (Item 299, Appendix F)
Solvent, Dry Cleaning (Item 83, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape
(Item 30, Appendix C)
a. Removal.
(1) Remove three bolts (1) from rotating clutch valve body
(2).
(2) Remove rotating clutch valve body (2) from main valve
body (3).
b. Disassembly.
NOTE
Rotating clutch solenoid assembly contains
parts which cannot be interchanged. Tag all
parts prior to removal.
(1) Remove seal (1) from rotating clutch valve body (2).
Discard seal.
(2) Remove three solenoid filter screens (3) from rotating
clutch valve body (2). Discard solenoid filter screens.
7-59
