TM 9-2320-366-34-2
c. Follow-On Maintenance.
(1) Install front drive shaft (left side) (TM 9-2320-366-20-3).
(1.1) Install gravel deflector and gravel deflector extension
(TM 9-2320-366-20-4).
(2) After first 1000 miles of vehicle operation, tighten self-
locking nuts on U-bolts, in increments of 50 lb-ft (68
N·m), to 390-510 lb-ft (529-692 N·m) in crisscross
pattern.
End of Task.
Change 1
14-9