TM 9-2320-366-34-4
(8) Remove rod (8) from vise.
(9) Position cylinder barrel (14) in vise.
(10) Install rod (8) in cylinder barrel (14).
(11) Install three back-up rings (15) and preformed packings
(16) on cartridge holding valve (17).
(12) Position cartridge holding valve (17) in cylinder barrel
(14).
(13) Tighten cartridge holding valve to 30-36 lb-ft (41-49
N·m).
(14) Install cylinder head (5) in cylinder barrel (14) with
setscrew (18).
End of Task.
26-45