TM 9-2320-366-34-4(8) Remove rod (8) from vise.(9) Position cylinder barrel (14) in vise.(10) Install rod (8) in cylinder barrel (14).(11) Install three back-up rings (15) and preformed packings(16) on cartridge holding valve (17).(12) Position cartridge holding valve (17) in cylinder barrel(14).(13) Tighten cartridge holding valve to 30-36 lb-ft (41-49N·m).(14) Install cylinder head (5) in cylinder barrel (14) withsetscrew (18).End of Task.26-45
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business