TM 9-2320-366-34-421-9. P2 PLANETARY CARRIER MODULE REPAIR (CONT)(4) Inspect four spindles (3) for scoring, nicks, cracks,burring, and corrosion.(5) Inspect eight thrust washers (4) for scoring, nicks,cracks, and burring.(6) Measure thickness of eight thrust washers (4), minimumthickness 0.057 in. (0.144 cm).(7) Inspect eight roller bearings (5) for cracked or brokencages, and pitting.(8) Inspect four P2 pinion gears (6) for scoring, pitting, nicks,burring, and missing teeth.(9) Measure inside diameter of bushing (7), maximum insidediameter 1.71 in. (4.34 cm).c. Assembly.(1) Install bushing (1) in P2 planetary carrier (2).(2) Install two sealrings (3) on P2 planetary carrier (2).(3) Install eight thrust washers (4), four roller bearings (5),and pinion gears (6) in P2 planetary carrier (2) with fourspindles (7).WARNINGUse care when installing retaining rings.Retaining rings are under tension and canact as projectiles when released. Failureto comply may result in injury topersonnel.(4) Install indexing ring (8) and retaining ring (9) in P2planetary carrier (2).21-48
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business