TM 9-2320-366-34-4
21-9. P2 PLANETARY CARRIER MODULE REPAIR
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Transmission disassembled (para 21-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Caliper, Micrometer, Inside (Item 10, Appendix B)
Caliper, Vernier (Item 11, Appendix B)
Press, Arbor, Hand Operated (Item 48, Appendix B)
Bushing Driver Set (TM 9-2320-366-20)
Tools and Special Tools (Cont)
Puller Kit, Universal (Item 50, Appendix B)
Handle, Drive (TM 9-2320-366-20)
Indicator, Dial (Item 36, Appendix B)
Materials/Parts
Rag, Wiping (Item 60, Appendix C)
Parts Kit, Seal Replacement (Item 318, Appendix
F)
a. Disassembly.
WARNING
Use care when removing retaining rings.
Retaining rings are under tension and can
act as projectiles when released. Failure
to comply may result in injury to
personnel.
(1) Remove retaining ring (1) from P3 planetary ring gear
(2).
(2) Remove P2 planetary carrier (3) from P3 planetary ring
gear (2).
(3) Remove retaining ring (4) and P2 indexing ring (5) from
P2 planetary carrier (3).
21-46