TM 9-2320-366-34-3
16-65. 30K WINCH RELIEF VALVE REPLACEMENT/REPAIR
This task covers:
a. Removal
b. Disassembly
c. Cleaning/Inspection
d. Assembly
e. Installation
f. Adjustment
g. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Hydraulic tank shut off valve closed (TM 9-2320-
366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Pan, Drain (Item 43, Appendix B)
Gloves (Item 26, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
STE/ICE-R (Item 70, Appendix B)
Transducer (10,000 PSI) (Item 1, Appendix G)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B)
Crowfoot Attachment, Socket Wrench (Item 17,
Appendix B)
Materials/Parts
Cap and Plug Set (Item 17, Appendix C)
Cap, Tube (Item 17.1, Appendix C)
Plug, Tube Fitting, Threaded (Item 55.2, Appendix C)
Reducer, Tube (Item 60.2, Appendix C)
Hose Assembly, Nonmetallic (Item 40.1, Appendix C)
Sealant (Item 70, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape (Item
30, Appendix C)
Packing,
Preformed (Item 237, Appendix F)
Lockwasher (12) (Item 132, Appendix F)
References
(TM 9-4910-511-12&P)
Personnel Required
(2)
Change 1
16-389
