13-40. M1089 SUBFRAME RAIL REPLACEMENT (CONT)
c. Follow-On Maintenance.
(1) Install crane brackets (para 13-8).
(2) Install arctic exhaust restrictor, if equipped (TM 9-2320-
366-20-5).
(3) Install cab arctic kit, if equipped (para 18-2).
(4) Install swingfire, if equipped (TM 9-2320-366-20-5).
(5) Install tool box (TM 9-2320-366-20-4).
(6) Install hydraulic manifold (TM 9-2320-366-20-5).
(7) Install fuel tank (TM 9-2320-366-20-3).
(8) Install wrecker control panel (TM 9-2320-366-20-5).
(9) Install transmission auxiliary oil cooler and bracket (TM
9-2320-366-20-4).
(10) Install underlift/stiffleg assembly (para 16-68).
(11) Install tool box support structure (para 15-12).
(12) Install Material Handling Crane (MHC) (para 16-32).
(13) Install 30K winch (para 16-63).
(14) Install crane boom rest (para 13-5).
End of Task.