TM 9-2320-366-34-2
13-31. M1089 FRAME RAIL REPLACEMENT (CONT)
(19) Install radiator/charge air cooler (TM 9-2320-366-20-3).
(20) Install air spring and bracket (TM 9-2320-366-20-5).
(21) Install suspension cylinder (para 17-2).
(22) Install cab to chassis ground strap (TM 9-2320-366-20-
4).
(23) Install arctic kit w/Power Takeoff (PTO) cable assembly,
if equipped (TM 9-2320-366-20-5).
(24) Install start and charging cable assembly (TM 9-2320-
366-20-4).
(25) Install battery box (TM 9-2320-366-20-4).
(26) Install radiator brackets (para 13-45).
(27) Install front shock absorber brackets (para 14-7).
(28) Install front spring brackets (para 14-6).
(29) Install front angle brackets (para 13-3).
(30) Install pneumatic tubes and hoses (TM 9-2320-366-20-
5).
(31) Install monoblock valve (para 16-85).
(32) Install engine assembly (para 3-3).
(33) Install auxiliary oil cooler hoses (TM 9-2320-366-20-4).
(34) Install transmission assembly (para 7-4).
(35) Install subframe rail (para 13-40).
(36) Install frame plate (para 13-21).
(37) Install cab front support (para 15-3).
(38) Install headlight and headlight housing (TM 9-2320-366-
20-3).
(39) Install front bumper and gravel deflector (TM 9-2320-
366-20-4).
(40) Perform front wheel toe-in alignment/adjustment (TM 9-
2320-366-20-4).
End of Task.
13-316
Change 1