TM 9-2320-366-34-2
(4) Position front lifting bracket (5) on frame rail (1) with six
bolts (6) and self-locking nuts (7).
(5) Position front bracket (8) on frame rail (1) with two bolts
(9) and self-locking nuts (10).
(6) Position four bolts (11) and self-locking nuts (12) in
frame rail (1).
(7) Position frame plate (13) on frame rail (1) with three
bolts (14) and self-locking nuts (15).
(8) Tighten three self-locking nuts (15) to 210-225 lb-ft (285-
305 N·m).
(9) Position frame plate (16) on frame rail (1) with bolt (17)
and self-locking nut (18).
(10) Position bolt (19) and self-locking nut (20) in frame plate
(16).
(11) Tighten self-locking nuts (18 and 20) to 210-225 lb-ft
(285-305 N·m).
13-313