TM 9-2320-366-34-2
13-24. M1083 FRAME RAIL REPLACEMENT (CONT)
CAUTION
When removing bolts, continuous removal of
collars is mandatory. Failure to comply will
result in seizing of collar to bolt.
NOTE
Steps (4) through (11) require the aid of an
assistant.
(4) Remove collar (11), bolt (12), and bracket (13) from
frame rail (4). Discard collar and bolt.
(5) Remove collar (14), bolt (15), and frame plate (16) from
frame rail (4). Discard collar and bolt.
(6) Remove three collars (17), bolts (18), and frame plate
(19) from frame rail (4). Discard collars and bolts.
CAUTION
Attach a sling to front lifting bracket prior to removal
of bolts and collars. Failure to comply may result in
damage to equipment.
(7) Remove six collars (20) and bolts (21) from frame rail
(4). Discard collars and bolts.
13-194