TM 9-2320-366-34-2
Section II. MAINTENANCE PROCEDURES
10-2. INTERMEDIATE AXLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Intermediate axle assembly wheels removed (TM 9-
2320-366-10-2).
Tools and Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Lift, Transmission/Differential (Item 39, Appendix B)
Trestle, Motor Vehicle Maintenance (2) (Item 81,
Appendix B)
Wrench, Torque, 0-600 lb-ft (Item 97, Appendix B)
Multiplier, Torque Wrench (Item 42, Appendix B)
Wrench, Torque, 0-175 lb-ft (Item 92, Appendix B)
Wrench Set, Socket (Item 84, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Hammer, Hand, Soft Head (Item 33, Appendix B)
Tools and Special Tools (Cont)
Wrench Set, Crowfoot Ratcheting (TM 9-2320-
366-20)
Sling, Cargo (2) (Item 56, Appendix B)
Jack, Dolly Type, Hydraulic (Item 37, Appendix
B)
Materials/Parts
Sealing Compound (Item 69, Appendix C)
Dispenser, Pressure Sensitive Adhesive Tape
(Item 30, Appendix C)
Sealing Compound (Item 75, Appendix C)
Screw, Self-Locking (8) (Item 366.1, Appendix
F)
Personnel Required
(3)
WARNING
Wear appropriate eye protection when
working under vehicle due to the
possibility of falling debris.
Failure to
comply may result in injury to personnel.
a. Removal.
(1) Place vehicle on trestles.
NOTE
Steps (2) through (4) require the aid of an
assistant.
(2) Remove four screws (1) and two bearing cups (2) from
drive yoke (3). Discard screws.
(3) Slide drive shaft (4) from side to side and separate
universal joint (5) from drive yoke (3).
(4) Attach drive shaft (4) to frame (6).
10-2
Change 1
