TM 9-2320-366-34-2
7-11. CONTROL VALVE MODULE REPAIR
This task covers:
a. Disassembly
b. Cleaning/Inspection
c. Assembly
d. Follow-On Maintenance
INITIAL SETUP
Equipment Condition
Transmission internal wiring harness removed (para
7-13).
Tools/Special Tools
Tool Kit, Genl Mech (Item 78, Appendix B)
Wrench, Torque, 0-150 lb-in. (Item 91, Appendix B)
Goggles, Industrial (Item 28, Appendix B)
Wrench Set, Socket (Item 85, Appendix B)
Tools and Special Tools (Cont)
Gloves, Rubber (Item 26, Appendix B)
Materials/Parts
Solvent, Dry Cleaning (Item 83, Appendix C)
Rag, Wiping (Item 60, Appendix C)
Honing Stone Assembly (Item 39, Appendix C)
Cloth, Abrasive (Item 22, Appendix C)
Gasket (Item 64, Appendix F)
a. Disassembly.
(1) Remove two bolts (1) and turbine speed sensor (2)
from main valve body (3).
(2) Remove eight bolts (4) and stationary clutch valve
body (5) from main valve body (3).
(3) Remove three bolts (6) and rotating clutch valve body
(7) from main valve body (3).
(4) Remove five bolts (8) and C6 clutch valve body (9)
from channel plate (10).
7-79
