TM 9-2320-366-34-3
(40) Position gladhand bracket (52) on spooler weldment (3)
with two screws (53), four washers (54), and two self-
locking nuts (55).
(41) Tighten two self-locking nuts (55) to 76-84 lb-ft (103-114
N·m).
(42) Install sandshoe (56) on stiffleg (14) with two screws
(57), six washers (58), and two self-locking nuts (59).
(43) Install tow lock pins (60) in sandshoe (56).
NOTE
Left and right side pay-out hydraulic motors
are installed the same way. Left side shown.
(44) Position pay-out hydraulic motor (61) on spooler
weldment (3) with two washers (62) and bolts (63).
(45) Tighten two bolts (63) to 76-84 lb-ft (103-114 N·m).
(46) Position two hoses (64) on pay-out hydraulic motor (61).
(47) Tighten two hoses (64) to 36-39 lb-ft (49-53 N·m).
16-479