• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
HOLDING VALVE CHECK - TM-9-2320-366-34-1_1194
MONOBLOCK VALVE FLOW TEST - TM-9-2320-366-34-1_1196

TM-9-2320-366-34-1 M1078 Series 2 1/2-Ton 4x4 Light Medium Tactical Vehicles (LMTV) Manual
Page Navigation
  1119    1120    1121    1122    1123  1124  1125    1126    1127    1128    1129  
TM 9-2320-366-34-1 KNOWN INFO POSSIBLE PROBLEMS TEST OPTIONS 1. START YES Hydraulic oil level OK. PTO OK. Hydraulic hoses, tubes and fittings OK. Is flow and pressure at input to monoblock valve assembly OK? Monoblock Valve Flow Test REASON FOR QUESTION WARNING Read WARNING on following page. j8.  M1089 MATERIAL HANDLING CRANE (MHC) HOIST DOES NOT WORK INITIAL SETUP   Equipment Conditions     Engine shut down (TM 9-2320-366-10).   Personnel Required     (2)   Tools and Special Tools     Tool Kit, Genl Mech (Item 78, Appendix B)     Tester, Hydraulic (Item 73, Appendix B)       Pan, Drain (Item 43, Appendix B)     Goggles, Industrial (Item 28, Appendix B) Faulty three stage hydraulic pump. Faulty monoblock valve. Faulty input check valve. Faulty main relief valve. Faulty manual override valve. NO Faulty three stage hydraulic pump or input check valve will cause low pressure to eight bank valve assembly. Replace three stage hydraulic pump (para 16-92). Materials/Parts   Rag, Wiping (Item 60, Appendix C)   Hose (2) (Item 40, Appendix C)   Fitting (2) (Item 31, Appendix C)   Reducer, Tube (Item 61, Appendix C)   Adapter, Swivel (Item 3, Appendix C)   Adapter, Pipe (Item 2, Appendix C)   Fitting (Item 32, Appendix C)   Adapter, Pipe (Item 1, Appendix C) 2-1062







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.