TM 9-2320-366-34-3
c. Adjustment.
(1) Install tee fitting (1) on 90-degree fitting (2).
(2) Install snubber (3) on tee fitting (1).
(3) Install transducer (4) on snubber (3).
(4) Install cable (5) to transducer (4).
(5) Position hose (6) on tee fitting (1).
(6) Tighten jamnut (7) on 90-degree fitting (2).
(7) Tighten hose (6) to 35-39 lb-ft (47-53 N·m).
(8) Open hydraulic reservoir supply and return valves (TM
9-2320-366-10-2).
(9) Raise underlift approximately two feet (TM 9-2320-366-
10-2).
(10) Verify STE/ICE-R reads 1950 psi (13445 kPa).
NOTE
Perform steps (10) through (13) if pressure
reading was not 1950 psi (13445 Kpa).
(10) Loosen jam nut (8) on counterbalance valve (9).
CAUTION
Steps (11) and (12) must be preformed at the
same time to get a correct reading. Failure
to comply may result in damage to
equipment.
(11) Operate underlift (TM 9-2320-366-10-2).
NOTE
Turn adjustment screw clockwise to increase
pressure and counterclockwise to decrease
pressure.
(12) Adjust screw (10) until STE/ICE-R reads 1950 psi (1345
Kpa).
(13) Hold adjustment screw (10) and tighten jam nut (8) on
counterbalance valve (9).
16-441