TM 9-2320-366-34-3
16-48. M1089 HOLDING VALVE REPLACEMENT (CONT)
b. Installation.
(1) Install preformed packing (1) on holding valve (2).
(2) Install two preformed packings (3) on holding valve (2).
(3) Install three preformed packings (4) on holding valve (2).
(4) Install holding valve (2) in motor control valve (5).
c. Follow-On Maintenance.
Perform crane load test (para 16-62).
End of Task.
16-258