TM 9-2320-366-34-2
13-38. M1084 SUBFRAME RAIL REPLACEMENT (CONT)
CAUTION
Ensure subframe rail flange is fully in contact
with main frame rail flange. Failure to comply
may result in damage to equipment.
NOTE
Steps (2) through (10) require the aid of an
assistant.
(2) Position bolt (2) and self-locking nut (3) in frame plate
(4).
(3) Position 14 bolts (5) and self-locking nuts (6) in frame
plate (3).
(4) Tighten self-locking nut (3) and 14 self-locking nuts (6)
to 210-225 lb-ft (285-305 N·m).
(5) Position six bolts (7) and self-locking nuts (8) in two
brackets (9).
(6) Tighten six self-locking nuts (8) to 210-225 lb-ft (285-305
N·m).
(7) Position two bolts (10) and self-locking nuts (11) in
bracket (12).
(8) Tighten two self-locking nuts (11) to 210-225 lb-ft (285-
305 N·m).
13-368