TM 9-2320-366-34-2
13-28. M1085 FRAME RAIL REPLACEMENT (CONT)
(30) Install intermediate axle shock absorber brackets (para
14-8).
(31) Install front shock absorber brackets (para 14-7).
(32) Install front spring brackets (para 14-6).
(33) Install stabilizer bracket (para 14-10).
(34) Install front angle brackets (para 13-3).
(35) Install auxiliary oil cooler hoses (TM 9-2320-366-20-4).
(36) Install subframe (para 13-37).
(37) Install engine assembly (para 3-3).
(38) Install transmission assembly (para 7-4).
(39) Install cab front support (para 15-3).
(40) Install arctic kit w/Power Takeoff (PTO) cable assembly,
if equipped (TM 9-2320-366-20-5).
(41) Install Power Takeoff (PTO) cable assembly, if equipped
(TM 9-2320-366-20-4).
(42) Install start and charging cable assembly (TM 9-2320-
366-20-4).
(43) Install headlight and headlight housing (TM 9-2320-366-
20-3).
(44) Install front bumper and gravel deflector removed (TM 9-
2320-366-20-4).
(45) Perform front wheel toe-in alignment/adjustment (TM 9-
2320-366-20-4).
End of Task.
13-270
Change 1