TM 9-2320-366-34-2
13-27. M1094 FRAME RAIL REPLACEMENT (CONT)
(30) Install intermediate axle shock absorber brackets (para
14-8).
(31) Install front shock absorber brackets (para 14-7).
(32) Install front spring brackets (para 14-6).
(33) Install stabilizer bracket (para 14-10).
(34) Install front angle brackets (para 13-3).
(35) Install subframe (para 13-36).
(36) Install engine assembly (para 3-3).
(37) Install transmission assembly (para 7-4).
(38) Install cab front support (para 15-3).
(39) Install arctic kit w/Power Takeoff (PTO) cable assembly,
if equipped (TM 9-2320-366-20-5).
(40) Install Power Takeoff (PTO) cable assembly, if equipped
(TM 9-2320-366-20-4).
(41) Install start and charging cable assembly (TM 9-2320-
366-20-4).
(42) Install headlight and headlight housing (TM 9-2320-366-
20-3).
(43) Install front bumper and gravel deflector (TM 9-2320-
366-20-4).
(44) Perform front wheel toe-in alignment/adjustment (TM 9-
2320-366-20-4).
End of Task.
13-252
Change 1