Change 1 2-859TM 9-2320-366-34-1CONTINUITY TESTCAUTIONUse care when disconnecting wiring harnessconnectors. Failure to comply may resultin damage to equipment.(1) Remove control valve module (para 7-10).(2) Remove four screws and cover fromcontrol valve module.(3) Disconnect internal wiring harnessconnector J from J solenoid.(4) Set multimeter to ohms.(5) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin H1.(6) Connect negative (-) probe of multimeterto internal wiring harness connector Jpin A and note reading on multimeter.(7) If continuity is not present, replacetransmission internal wiring harness(para 7-13).(8) Connect positive (+) probe of multimeterto internal wiring harness 24-pin connectorpin H1.(9) Connect negative (-) probe of multimeterto all other pins in internal wiring harness24-pin connector and note reading onmultimeter.(10) Connect negative (-) probe of multimeterto ground and note reading on multimeter.(11) If continuity is present, transmissioninternal wiring harness is shorted; replacetransmission internal wiring harness(para 7-13).
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business