Change 1 2-215TM 9-2320-366-34-1CAUTIONCONTINUITY TEST(1) Remove control valve module (para 7-10).(2) Remove four screws and cover fromcontrol valve module.(3) Disconnect internal wiring harnessconnector B from B solenoid.(4) Set multimeter to ohms.(5) Connect positive (+) probe of multimeter to internal wiring harness 31-pin connectorpin J.(6) Connect negative (-) probe of multimeter to internal wiring harness connector Bpin A and note reading on multimeter.(7) If continuity is not present, replace transmission internal wiring harness (para 7-13).(8) Connect positive (+) probe of multimeter to internal wiring harness 31-pin connectorpin J.(9) Connect negative (-) probe of multimeter toall other pins in internal wiring harness31-pin connector and note reading onmultimeter.(10) Connect negative (-) probe of multimeter toground and note reading on multimeter.(11) If continuity is present, transmissioninternal wiring harness is shorted; replacetransmission internal wiring harness(para 7-13).Use care when disconnecting wiring harnessconnectors. Failure to comply may result indamage to equipment.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business