Change 1 2-1072.11
PRESSURE TEST
(1) Disconnect hose B from fitting at port B
of valve manifold.
(2) Install swivel run tee on fitting at
port B of valve manifold.
(3) Connect hydraulic hose B to swivel run tee.
(4) Connect adapter, hose, and STE/ICE adaptor
to swivel run tee.
(5) Start engine (TM 9-2320-366-10-1).
(6) Position PTO switch to on (TM 9-2320-
366-10-1).
(7) Increase engine RPM to 1250-1450
(TM 9-2320-366-10-1).
(8) Press and hold DUMP BED UP/DOWN
switch in the DOWN position until hydraulic
oil temperature reaches 145°F-155°F
(63°C-68°C).
(9) Perform STE/ICE Test #51 (TM 9-4910-
571-12&P)
Holding DUMP BED UP/DOWN switch in the
down position will force hydraulic oil through
relief valve and cause oil temperature to rise.
Measure hydraulic oil temperature near
bottom of hydraulic reservoir.
NOTE
Hydraulic oil temperature must be 145°F-
155°F (63°C- 68°C) prior to performing
troubleshooting checks. Failure to comply
may result in inaccurate test results.
CAUTION
Lubricating oil is slippery and can cause falls.
Wipe up spilled oil with rags. Failure to comply
may result in injury to personnel.
Prolonged contact with lubricating oil (MIL-L-21
04) may cause a skin rash. Skin and clothing
that come in contact with lubricating oil should
be thoroughly washed immediately. Saturated
clothing should be removed immediately. Areas
in which lubricating oil is used should be well
ventilated to keep fumes to a minimum. Failure
to comply may result in injury to personnel.
Wear approved eye protection when performing
pressure checks. Failure to comply may result
in oil getting into eyes. If oil contacts eyes,
seek medical attention immediately.
Dump body weighs approximately 3,030 lbs.
(1,376 kgs). Attach a suitable lifting device
prior to lifting. Failure to comply may result in
injury to personnel.
WARNING
PRESSURE TEST (Cont)
TM 9-2320-366-34-1
(10) Hold DUMP BED UP/DOWN switch in
the DOWN position and observe pressure
reading of 325-375 psi (2241-2586 kPa).
If pressure is low, adjust pressure reducing
valve clockwise. If pressure is high, adjust
pressure reducing valve counterclockwise.
If pressure cannot be adjusted, clean or
replace pressure reducing valve (para 17-3).
(11) Reduce engine RPM to idle (TM 9-2320-
366-10-1).
(12) Position PTO switch to off (TM 9-2320-
366-10-1).
(13) Shut down engine (TM 9-2320-366-10-1).
(14) If pressure can be adjusted, but dump
bed still does not raise, replace hoist
cylinder (para 17-4).
(15) Remove STE/ICE adaptor, hose and
adapter from swivel run tee.
(16) Remove hose B from swivel run tee.
(17) Remove swivel run tee from port B of
valve manifold.
(18) Connect hose B to port B of valve manifold.
