TM 9-2320-366-34-3
(5) Install jack cylinder (2) in outrigger (1) with pin (4).
(6) Install two cotter pins (5) in pin (4).
(7) Install two preformed packings (6) on adapters (7).
(8) Install two adapters (7) in jack cylinder (2).
(9) Connect two hoses (8) to adapters (7).
(10) Install cover plate (9) on outrigger (1) with four
lockwashers (10) and screws (11).
c. Follow-On Maintenance.
Perform crane load test (para 16-62).
End of Task.
16-305