TM 9-2320-366-34-3
(7) Connect hydraulic hose (10) to 90-degree fitting (3).
c. Follow-On Maintenance.
(1) Install hydraulic motor valve assembly (para. 16-47).
(2) Connect batteries (TM 9-2320-366-20-3).
(3) Perform crane load test (para 16-62).
End of Task.
16-261