TM 9-2320-366-34-2
(9) Position rear torque arm bracket (9) on frame plate (1)
with eight bolts (10) and self-locking nuts (11).
(10) Tighten eight self-locking nuts (11) to 390-510 lb-ft (529-
691 N·m).
(11) Position two clamps (12) on frame plate (1) with two
bolts (13) and self-locking nuts (14).
(12) Tighten two self-locking nuts (14) to 84-108 lb-in. (10-12
N·m).
e. Follow-On Maintenance.
(1) Install 15K Self-Recovery Winch (SRW) cable pulleys, if
equipped (TM 9-2320-366-20-5).
(2) Install resilient mount and mechanical stops (TM 9-2320-
366-20-4).
(3) Install rear torque rods (para 14-5).
(4) Install rear axle bogie shaft (para 10-4).
End of Task.
13-135