TM 9-2320-366-34-2
e. Follow-On Maintenance.
(1) Install 15K Self-Recovery Winch (SRW) cable pulleys, if
equipped (RH side) (TM 9-2320-366-20-5).
(2) Install resilient mount and mechanical stops (TM 9-2320-
366-20-4).
(3) Install rear torque rods (para 14-5).
(4) Install rear axle bogie shaft (para 10-4).
End of Task.
13-93