• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
WHEEL BEARING SHIM TOOL REST
BATTERY GROUND CABLE ASSEMBLY 12378575

TM-9-2320-366-34-1 M1078 Series 2 1/2-Ton 4x4 Light Medium Tactical Vehicles (LMTV) Manual
Page Navigation
  1268    1269    1270    1271    1272  1273  1274    1275    1276    1277    1278  
TM 9-2320-366-34-1 Figure  D-53.   Battery  12V  Cable  Assembly a.  All dimensions are in inches (centimeters). b.  Strip 0.69 inch (1.3 cm) insulation from ends of three cables (1, 2 and 11). c.  Install band marker (6) on cable (1) at position shown in  Figure  D-53.   Battery  12V  Cable  Assembly. d.  Mark two marker sleeves (7) in ink with characters 1/8 inch (0.3 cm) high, as follows:  19207-12378575. e.  Install marker sleeve (7) on cable (1) at position shown in  Figure  D-53.   Battery  12V  Cable  Assembly. f.  Install marker sleeve (7) on cable (11) at position shown in  Figure  D-53.   Battery  12V  Cable  Assembly. g.  Install sleeve (8) on cable over marker sleeves (7). h.  Install sleeve (8) on cable over marker sleeves (7). i.  Stamp  12V  using metal stamping tools on lug terminal (5). Make sure  12V  is stamped on lug terminal side that can be seen when battery 12V cable assembly is installed on vehicle battery. See battery layout in Figure D-53. Battery  12V  Cable  Assembly. j.  Stamp a plus (+) sign using metal stamping tools on lug terminals (3 and 4). Make sure (+) i s stamped on lug terminal side that can be seen when battery 12V cable assembly is installed on vehicle battery. See battery layout in  Figure  D-53.   Battery  12V  Cable  Assembly. k.  Stamp a minus (-) sign using metal stamping tools on two lug terminals (12). Make sure (-) i s stamped on lug terminal side that can be seen when battery 12V cable assembly is installed on vehicle battery. See battery layout in  Figure  D-53.   Battery  12V  Cable  Assembly. l.  Install sleeving (9) over each end of cable (1). m.  Install sleeving (9) over each end of cable (2). n.  Install sleeving (9) over each end of cable (11a). o.  Install sleeving (9) over each end of cable (11b). p.  Insert ends of cable (11a) into lug terminals (12a and 3). Make sure lug terminals are turned so stamped marks on lug terminal sides can be seen when battery 12V cable assembly is installed on vehicle battery. See battery layout in  Figure  D-53.   Battery  12V  Cable  Assembly. q.  Crimp lug terminals (3 and 12a) to ends of cable (11a). r.  Insert end of cable (2) into lug terminal (3). s.  Crimp lug terminal (3) to end of cable (2). t.  Insert  end  of  cable  (2)  into  lug  terminal  (12b).  Make  sure  lug  terminals  are  turned  so  stamped  marks  on  lug terminal sides can be seen when battery 12V cable assembly is installed on vehicle battery. See battery layout in  Figure  D-53.   Battery  12V  Cable  Assembly. u.  Crimp lug terminal (12b) to end of cable (2). D-59







Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.